Who seeks shall find

Gold mining Corp

We found !

About Us

We are always where the gold is

Gold Mining Corp is a privately held Swiss commodity company with a focus on gold mining and trading. Our aim is the sustainable growth of our own subsidiaries in the focus area Kazakhstan

The owner of the contract is Gold Mining Corp. LLP. (100% of the share in the LLP belongs to the Doblima AG registered in Switzerland).Contact us by clicking the “Contact” button and find out more.

Contract №1850

Dated September 16, 2005 for the Exploration and Extraction of gold and silver from the tailings of the old tailings of Zyryanovsky Lead Plant JSC in the East Kazakhstan region of the Republic of Kazakhstan

Management

Trust management of the participation shares is carried out by the Swiss Holding Doblima AG.

Project implementation

The company "Doblima AG" is implementing this project within the framework of the Agreement signed on February 8, 2012 between the Government of the Republic of Kazakhstan and the Government of the Federal Republic of Germany on partnership in the raw materials, industrial and technological fields.

Our contractors

DEB INVEST

"Di-As Company LTD"

Our contract

We value your time like gold

Exploration of the field

The deposit is located: Republic of Kazakhstan, East Kazakhstan region, Altai (formerly Zyryanovsk), within the city boundaries. 
The area of the geological allotment is 1.31 sq. km.
Exploration of the field has been completely completed, the reserves of the field have been approved and put on the state balance sheet of the Republic of Kazakhstan, and the transition to the contract production stage is currently being formalized. (The production period under the contract will be determined on the basis of the production project document; according to the approved feasibility study, it is 22 years).
GoldMiningCorp we are gold among the sand.

This deposit

This deposit was assessed in 2010 in accordance with the JORC Code.
The total amount of “sands” in the tailings of the Old tailing dump of Zyryanovsky Lead Plant JSC is 36,215,560 tons with an average Au content of 1.0 g/t, of which, according to the JORC code, 8,110,127 tons with an Au content of 1.2 g/t are assessed as “indicated” and 28,105,433 t with Au content – 1.0 g/t – as “inferred”.
Tailings resources of the old tailings dump of jsc zyryanov lead plant assessed in accordance with the jorc code.
GoldMiningCorp we are gold among the sand.

Start your journey through the golden springs with us

Results

Based on the results of all the work carried out, a technological regulation was drawn up for the design of an enrichment plant using a combined gravity-flotation enrichment scheme with the production of marketable products: gravity and flotation concentrate.

Technological research

A lot of technological studies have been carried out on the deposit, which were carried out at the State Enterprise "VNIITSVETMET", CJSC "ITOMAK", LLP "Altai Ken-Bayytu", JSC "Varvarinskoye" (Polymetal), Pribalkhash Concentrator Plant, LLP "Di-As Company LTD" and etc

The results of the technological study made it possible to fairly fully determine the physical, mechanical and technological properties of the tailings, as well as determine the direction of opening and mining.

Сareer information

A feasibility study of industrial standards has been developed and approved by the State Reserves Committee of the Republic of Kazakhstan. A preliminary geological and economic analysis of the calculated reserves with a cut-off gold content of 0.2 g/t has established that the development of reserves in one open pit to the full depth of useful capacity is profitable. If the enterprise is provided with reserves for 20 years, the payback period for capital investments will be 3.8 years, with an internal rate of return (IRR) of 52.54%. The productivity of the quarry for the extraction of technogenic mineral raw materials in the first year is assumed to be 350 thousand tons/year, and starting from the fourth year – 2000 thousand tons/year.
There are alternative business plans for various extraction technologies.
GoldMiningCorp we are gold among the sand.

If you need more information,please contact us

We will provide you with all the necessary information and documents as soon as possible, and also answer your questions.

Our Object

The field has all the necessary infrastructure, a modern analytical laboratory, a pilot industrial site, and a set of initially necessary equipment. At the temporary storage site on the territory of the TMO, products of pilot-industrial study in a volume of more than 80,000 tons with an average Au content of 3-20 g/t are placed; Ag: 6-60 g/t. These products can be initially used when starting up an enrichment plant. In 2025, a decision was received from the competent authority to begin negotiations on the conditions and procedure for production in the contract territory.

Scroll to Top